Cloud Migration
Zero-downtime lift-and-shift, replatform and refactor across massive workloads.
We move massive, regulated workloads to public cloud with zero downtime — using proven 6R strategies, cutover automation and rollback safety nets.
A botched migration can freeze roadmaps for years. Our migration factory delivers wave-based cutovers with clear success gates and reversible steps.
Everything included in
Cloud Migration.
6R Strategy
Retain, retire, rehost, replatform, repurchase or refactor — decided per workload.
Landing Zones
Account factory, network hub-spoke, IAM baseline and guardrails.
Database Migration
Online replication for Oracle, SQL Server, DB2, MySQL and Postgres.
Data Warehouse Migration
Teradata / Netezza / Exadata to Snowflake, BigQuery or Redshift.
Cutover Automation
Repeatable pipelines with automatic rollback on health failure.
Datacenter Exit
Full DC evacuation programs with wave planning and stakeholder ops.
A repeatable engagement,
tuned to your estate.
- PHASE 01Assess
Portfolio discovery, TCO model and wave planning.
- PHASE 02Mobilize
Landing zone, tooling and factory stood up in 4-6 weeks.
- PHASE 03Migrate
Weekly cutover waves with automated validation and rollback.
- PHASE 04Optimize
Right-size, refactor hotspots, retire duplicates post-move.
The stack we deploy
on day one.
- · Cloudamize
- · Movere
- · StratoZone
- · AWS DMS / MGN
- · Azure Migrate
- · GCP Migrate
- · Terraform pipelines
- · Blue/green cutover
- · Automated rollback
Best-in-class tools we bring in.
Common questions,
answered.
What's a typical migration wave size?+
20-40 workloads per wave, cadence set by change control. We've delivered 200-workload waves for datacenter exits.